Ference,
Weicker & Company
Inspection of Marine
Facilities
Inspection,
evaluation, and cost assessment for 30 Transport Canada marine facilities.
BC (1997-2000)
Fisheries
& Oceans, Small Craft Harbours Branch
Harbour Planning
Preparation of Harbour Management Documents for a number of SCHB harbours.
Ucluelet, Tofino, French Creek, Saltspring Island, Sointula, Alert Bay,
Winter Harbour, Prince Rupert, Gibsons, and Tsehum, BC (1990-1996)
Inspection of Marine
Facilities
Inspection, evaluation, and preparation of Marine Engineering Inspection
Reports for the following SCHB harbour facilities: Albion, Alert Bay,
Bella Bella, Bella Coola, Bull Harbour, Burgoyne Bay, Campbell River,
Cape Mudge, Caulfeild, Cortes Bay, Courtenay Slough, Cow Bay, Cowichan
Bay, Crofton, Deep Bay, Degnen Bay, Dodge Cove, Egmont, Fairview Bay,
Fanny Bay, Ford Cove, French Creek, Fulford Harbour, Ganges Harbour,
Gibsons, Gilford Island, Gorge Harbour, Heriot Bay, Horton Bay, Hospital
Bay, Kelsey Bay, Lyall Harbour, Madiera Park, Mansons Landing, Minstrel
Island, Mitchell Bay, Mount Gardner Park, Musgrave, North Galiano, Ocean
Falls, Okeover Inlet, Porpoise Bay, Port Desire, Powell River, Quathiaski
Cove, Rushbrook, Saltery Bay, Secret Cove, Shoal Bay, Sointula, Squamish,
Squirrel Cove, Vesuvius Bay, West Bay, Whaler Bay, Whiskey Slough, Winter
Harbour, Zeballos, BC (1993-Present)
Fletcher
Challenge Canada Ltd.
Barge Facilities
Design of modification
to railcar barge ramp. Crofton BC (1987)
Dam Structure
Project review for
the study and design of a low level dam. Williston Lake, BC (1987-88)
Fraser
River Pile & Dredge Ltd.
Barge Facilities
Detailed design and construction supervision of new wood chip barge
facility for Howe Sound Pulp & Paper. Port Mellon, BC (1989-1990)
Design and construction
supervision of new scow berth for Doman Forest Products. Richmond, BC
(1990)
Bulk Loading Terminals
Preliminary and
detailed design of repair schemes for existing zinc ore loading trestle
and wharf structures, Westmin Resources Ltd., Tyee Spit Terminal. Campbell
River, BC (1993)
Inspection of Marine
Facilities
Inspection and structural
assessment of a number of timber highway bridges, District of Pitt Meadows,
BC (1995-1996)
Pipelines
Investigation and
computer simulation of the laying of a 7 km long, 750 mm diameter steel
outfall pipeline in Okanagan Lake, in water depths of 30 - 65 m. Vernon,
BC (1987)
Investigation and
computer simulation of the laying of a 1km long, 1200mm diameter steel
outfall pipeline in Okanagan Lake in water depths of up to 60m. Kelowna,
BC (1992)
Retaining Walls
Design
of new steel sheet pile wall structure for Fraser Surrey Docks. Surrey,
BC (2000)
Temporary Works Design
Design of falsework
for construction of ferry terminal wing walls. Swartz Bay, BC (1992)
Design of falsework
for construction of dolphin structures. Shellburn Refinery, Burnaby,
BC (1993)
|
Company | Clients
| Projects | Downloads
| Contact Us | Search
| Site Map |
©
2009 Villholth Jensen & Associates Ltd. All Rights Reserved
Last Updated: June 2009
This
site is maintained by Karin Jensen
|