Ferry Terminals
BC Ferry Corporation:
Horseshoe Bay & Nanaimo
Conceptual design
of marine facilities for fast ferry operation, including loading ramps
and berthing structures. Horseshoe Bay and Nanaimo, BC (1994-1995)
BC Ferry Corporation:
Tsawwassen
Planning, detailed design, and construction supervision of new ramp at Berth #2. Tsawwassen, BC (2003-2005)
Development, detailed design, and construction supervision of restaurant
and foot passenger buildings. Tsawwassen, BC (1995)
Planning and conceptual
design of the Tsawwassen Terminal Phase II development including marine
facilities, civil facilities, and infrastructure. Tsawwassen, BC (1994-1995)
Planning and design
of new fender system for the N30 turning dolphin in Berth No. 5. Tsawwassen,
BC (1994)
Design, contract
preparation, and construction supervision of upgrading of berthing structures
in Berth No. 5. Tsawwassen, BC (1992-1993)
Complete design, from concept to installation, and commissioning of
new automatic ferry ramp system for BC Ferry Corporation's new ferry
class. Berth No. 5. Tsawwassen, BC (1989-1991)
BC Ferry Corporation:
Swartz Bay
Development, detailed design, and construction supervision of new ferry
terminal berth, including new automatic ferry ramp system. Berth No.
1. Swartz Bay, BC (1991-1992)
Upgrading and replacement
of ferry ramp with new double deck structure. Berth No. 3. Swartz Bay,
BC (1990-1991)
BC Ferry Corporation:
Horseshoe Bay
Development, detailed design, and construction supervision of new automated
passenger loading ramp. Horseshoe Bay, BC (1995-1996)
Development, detailed
design, and construction supervision of new multi-apron ferry ramps
equipped with primary and secondary aprons designed to ensure smooth
transition from land to ramp and from ramp to ferry. Berth Nos. 1, 2,
and 3. Horseshoe Bay, BC (1988-1990)
Structural evaluation
and cost estimate of repair of damaged ramps at Berth No. 2; insurance
assessment. Horseshoe Bay, BC (1989)
Study and preliminary
design of modifications to hydraulic hoisting system. Horseshoe Bay,
BC (1989)
Computer analysis
and structural evaluation of load-carrying capacity of lower ramps.
Horseshoe Bay, BC (1988)
BC Ferry Corporation:
Langdale
Structural evaluation
and cost estimate of repair of damaged ramp, Berth No. 2; insurance
assessment. Langdale, BC (1989)
BC Ferry Corporation:
Westview
Structural evaluation
of existing timber access trestle. Westview, BC (1988)
BC Ferry Corporation:
Snug Cove
Planning and design
of holding area. Snug Cove, BC (1986)
BC Ferry Corporation:
Deas Dock
Inspection of four
service ramps and design of modifications to ramp supports and hoisting
systems. Richmond, BC (1987)
Construction supervision
of steel sheet pile retaining wall. Richmond, BC (1987)
|
Company | Clients
| Projects | Downloads
| Contact Us | Search
| Site Map |
©
2009 Villholth Jensen & Associates Ltd. All Rights Reserved
Last Updated: June 2009
This
site is maintained by Karin Jensen
|