|
Marine & Transportation
Tip:
Click for more
information about a project
Wharf Structures
City of Burnaby
Detailed
design and construction
supervision of viewing pier at Tillicum Street. Burnaby, BC (1999)
Arrow Marine Services
Planning,
design, and supervision of construction of 300 tons travelift. Richmond,
BC (1998-1999)
Vancouver Port Commission
Conceptual design
of new wharf structures between Centennial Pier and Ballantine Pier.
Port of Vancouver, Vancouver, BC (1994)
Conceptual design
of new cruise ship facility. Port of Vancouver, Vancouver, BC (1994)
Development of feasible
repair scheme, detailed design, and construction supervision of structural
repair work at LaPointe Pier. Port of Vancouver, Vancouver, BC (1988-1989)
Study and detailed
design for the rehabilitation of caisson pier structure at Centennial
Pier. Port of Vancouver, Vancouver, BC (1988)
Ocean Fisheries
Ltd.
Detailed design
of temporary repair of existing wharf. Vancouver, BC (1994)
Vancouver Pile Driving
Ltd.
Design of remedial
repair and upgrading scheme for yard service wharf. North Vancouver,
BC (1991)
Inspection and structural
assessment of existing graving dock and wharf structures. North Vancouver,
BC (1986)
|
Company | Clients
| Projects | Downloads
| Contact Us | Search
| Site Map |
©
2009 Villholth Jensen & Associates Ltd. All Rights Reserved
Last Updated: June 2009
This
site is maintained by Karin Jensen
|