![]() |
||||||||||
|
||||||||||
|
Projects by Category+
Marine & Transportation |
Highway Bridge Design
Description:Mashiter Creek is subject to periods of torrential run-off and timber debris accumulation. The bridge embankments, central pier, and pile footings were riprap protected against these conditions. Being located in a high-risk seismic area, the steel reinforcement connections between the pre-stressed stringers and the abutments and pile cap were designed as ductile plastic hinges.
| Company | Clients | Projects | Downloads | Contact Us | Search | Site Map | ©
2009 Villholth Jensen & Associates Ltd. All Rights Reserved This site is maintained by Karin Jensen |
|||||||||